Neighborhood permit snapshots

Valley neighborhoods we work in

What owners in 91335, 91356, 91344, 91405, 91406, 91605, 91606, 91352 are building, what it could rent for, and what the lots allow.

1 · Permit activity

Where Valley owners are building

Homes that pulled a building permit after a sale · Jan 2, 2020–Dec 30, 2024; permits tracked through Sep 25, 2026 · Insights Realty analysis. Each row opens its neighborhood page.

2 · Market note · October 2026

Most buyers wait over a year to pull a permit.

543 days

Median time from purchase to first permit

18%

Permit within 6 months

38%

Permit within 1 year

What it means: planning before you close can save a year of carrying costs.

Review my lot before I buy

3 · Rules timeline

What changed, and what it means for your lot

  1. In effect

    Jan 1, 2022

    SB 9: lot splits and duplexes

    State law created a process for eligible lots. Parcel eligibility and local exclusions apply.

  2. In effect

    Ongoing

    State ADU and JADU rules

    State standards apply; property conditions and local review still matter.

  3. Phasing in

    Jul 1, 2026

    SB 79: housing near transit

    Los Angeles is phasing SB 79 in by transit stop; eligibility depends on your parcel.

  4. Watch

    Next date

    Next LA milestone

    Added when announced.

General context only; confirm rules, eligibility, and permit requirements for your specific parcel.

Data by postal code

The ZIP-level detail.

ZIPNew ADU permits since Jan 2024Median days to permit, new ADUsMedian declared construction value, new ADUHome additions since Jan 2024Median days to permit, additionsPermits mentioning SB 9 or a lot splitADU permits per 1,000 single-family lots
91335190145 days$131,50048185.5 days14615.4
9135671149 days$110,00017998 days4012.4
91344183149 days$120,00046292 days9913.2
9140594142 days$125,50016579 days5620.4
91406126169 days$123,00029887.5 days8615.7
91605124138.5 days$139,50029476 days9018.6
91606105184 days$150,00031183 days7220
91352147167 days$121,00030288 days10820.1

Source: City of Los Angeles Open Data – LADBS Building Permits Issued from 2020 to Present · Updated October 10, 2026

Refresh status for this source could not be confirmed.

A lot, reimagined

A typical project.

Every lot is different. This illustration shows one possible way to think about added housing; it is not a property study or a promise of what a specific parcel allows.

Before

Illustration of an underused lot before added housing

After

Illustration of the same lot with proposed added housing
Illustration — not an actual project

State guidance · local review matters

What the rules allow here.

California’s ADU and JADU framework sets statewide standards, while parcel conditions and local review still affect a project. See the California HCD ADU guidance.

Some parcels may qualify for an SB 9 duplex or urban lot split, subject to statutory requirements and site-specific exclusions. Read HCD’s SB 9 fact sheet.

Home additions are reviewed under applicable local approvals and California residential building standards; requirements depend on the property and proposed work. See HCD building standards.

Los Angeles is phasing SB 79 in by transit stop; eligibility depends on your parcel.

This information is general context, not legal, zoning, or permit advice. A property-specific review is required.

Start with the property

Get a free review for your San Fernando Valley property.

Get a free property review

A 20-minute call and an initial parcel check.

Or call (213) 537-9530