ADU permits since Jan 2024 (all types)
389
Local permit snapshot
What owners in 91324 and 91325 are building, with combined permit statistics and separate ZIP-level detail.
Across 91324 and 91325, Northridge owners have pulled 389 ADU permits (all types) since January 2024. The combined submission-to-permit median is 115 days, calculated from the underlying records for both ZIPs—not an average of their medians. ZIP-level figures are shown separately below. Source: LADBS via City of LA Open Data · Data through 2026-10-17.
Issued permits · Jan 2024 onward
ZIP 91324 + 91325
ADU permits since Jan 2024 (all types)
389
Median days from submission to permit, all ADUs
115 days
New detached ADU permits since Jan 2024
152
Non-ADU home additions since Jan 2024
159
Median declared value of new detached ADU permits: $126,500. That’s the declared construction value on the permit, not total project cost.
Source: LADBS via City of LA Open Data · Data through 2026-10-17
LADBS permit detail
ADU permits since Jan 2024 (all types)
389
Declared ADU units on permits since Jan 2024
422
Sum of adu_changed on permits, not completed units.
Median days from submission to permit, all ADUs since Jan 2024
115 days
New detached ADU permits since Jan 2024
152
Permits, not units: these permits declare 162 ADU units.
Median days from permit to certificate of occupancy (CofO)
352 days
Share of 2020–2023 ADU permits with a CofO
80%
Rounded to a whole percent.
Junior ADU (JADU) permits since Jan 2024
110
Unique parcels with SB 9 or lot-split permits since Jan 2022
99
ADU permits describing legalization since Jan 2023
5
Non-ADU home additions since Jan 2024
159
Median 94 days from submission to permit.
Source: LADBS via City of LA Open Data · Data through 2026-10-17
| Year | ADU permits | Median days, submission to permit | ADU permits with CofO | Non-ADU home additions |
|---|---|---|---|---|
| 2017 | 47 | — | — | 85 |
| 2018 | 106 | — | 40 | 84 |
| 2019 | 139 | — | 80 | 64 |
| 2020 | 64 | 128 days | 95 | 42 |
| 2021 | 111 | 192 days | 64 | 52 |
| 2022 | 126 | 162 days | 80 | 79 |
| 2023 | 126 | 148 days | 92 | 74 |
| 2024 | 136 | 148 days | 109 | 63 |
| 2025 | 151 | 96 days | 133 | 62 |
| 2026 (partial, through October 17, 2026) | 102 | 106 days | 109 | 34 |
| Type | Share of permits | Median size | Median declared value |
|---|---|---|---|
| Garage conversion | 41% | 476 sq ft | $50,000 |
| New detached | 39% | 1,078 sq ft | $125,500 |
| Other conversion | 10% | 574 sq ft | $50,000 |
| Attached addition | 8% | 875 sq ft | $120,000 |
| Other | 1% | 422 sq ft | $40,000 |
| Type | Permits | Declared ADU units |
|---|---|---|
| Garage conversion | 155 | 157 |
| New detached | 152 | 162 |
| Other conversion | 43 | 62 |
| Attached addition | 34 | 36 |
| Other | 5 | 5 |
| All types | 389 | 422 |
Source: LADBS via City of LA Open Data · Data through 2026-10-17
Data by postal code
| ZIP | ADU permits since Jan 2024 (all types) | Median days to permit, all ADUs since Jan 2024 | New detached ADU permits since Jan 2024 | Median days to permit, new detached ADUs | Median declared construction value, new detached ADU | Non-ADU home additions since Jan 2024 | Median days to permit, non-ADU additions | Unique parcels with SB 9 or lot-split permits since Jan 2022 | ADU permits per 1,000 single-family lots |
|---|---|---|---|---|---|---|---|---|---|
| 91324 | 167 | 94 days | 57 | 145 days | $128,300 | 61 | 80 days | 35 | — |
| 91325 | 222 | 132 days | 95 | 172 days | $125,000 | 98 | 100 days | 64 | — |
Source: LADBS via City of LA Open Data · Data through 2026-10-17
Common questions
Since January 2024, all ADU permits in 91324 and 91325 have taken a median of 115 days from submission to issue. Your timeline depends on plan completeness and plan-check type. Source: LADBS via City of LA Open Data · Data through 2026-10-17.
This permit snapshot does not include lot-size or zoning data for these ZIPs. California law allows detached ADUs up to 1,200 sq ft, subject to applicable standards. An SB 9 lot split needs both new lots to be at least 1,200 sq ft and at least 40% of the original lot. These figures do not determine parcel eligibility. Try the feasibility screen for your address.
Rent benchmarks are not included in this permit-only snapshot. Your free review includes a 15-minute call and initial parcel check, with a market rent check discussed on the call.
A lot, reimagined
Every lot is different. This illustration shows one possible way to think about added housing; it is not a property study or a promise of what a specific parcel allows.
Before
After
State guidance · local review matters
California’s ADU and JADU framework sets statewide standards, while parcel conditions and local review still affect a project. See the California HCD ADU guidance.
Some parcels may qualify for an SB 9 duplex or urban lot split, subject to statutory requirements and site-specific exclusions. Read HCD’s SB 9 fact sheet.
Home additions are reviewed under applicable local approvals and California residential building standards; requirements depend on the property and proposed work. See HCD building standards.
This information is general context, not legal, zoning, or permit advice. A property-specific review is required.