New ADU permits since Jan 2024
220
Local permit snapshot
What owners in 91405 and 91406 are building, what it could rent for, and what the lots allow.
Across 91405 and 91406, Van Nuys has 12,647 single-family lots. The median lot in 91406 is 6,600 sq ft. New ADU permits run at 17.4 per 1,000 single-family lots since January 2024.
Issued permits · Jan 2024 onward
ZIP 91405 + 91406
New ADU permits since Jan 2024
220
Median days from submission to permit, new ADUs
151.5 days
ADU permits per 1,000 single-family lots
17.4
Home additions permitted since Jan 2024
463
Median declared ADU valuation: $125,000. That’s the construction value on the permit, not total project cost.
Source: City of Los Angeles Open Data – LADBS Building Permits Issued from 2020 to Present · Updated October 10, 2026
Refresh status for this source could not be confirmed.
HUD benchmark
| ZIP | Studio | 1 BR | 2 BR |
|---|---|---|---|
| 91405 Van Nuys | $2,170 | $2,420 | $2,990 |
| 91406 Van Nuys | $2,210 | $2,470 | $3,050 |
Source: HUD FY2027 Small Area Fair Market Rents · Updated FY2027
Data may be out of date.
Assessor parcel data
Single-family lots
4,597
Median lot size
6,757 sq ft
Lots 7,500 sq ft or larger
31%
Homes built before 1960
80%
Median home size
1,570 sq ft
Owner-occupied
45%
Based on the homeowners' exemption.
Lots that already have a second building
8%
Single-family lots
8,050
Median lot size
6,600 sq ft
Lots 7,500 sq ft or larger
31%
Homes built before 1960
90%
Median home size
1,466 sq ft
Owner-occupied
47%
Based on the homeowners' exemption.
Lots that already have a second building
6%
By ZIP, median lot sizes run 6,600–6,757 sq ft, median homes are 1,466–1,570 sq ft and 80%–90% of homes were built before 1960.
Source: LA County Assessor parcels (public parcel layer) · Updated October 14, 2026
Refresh status for this source could not be confirmed.
Zoning of single-family lots
91405 · Van Nuys
90% in single-family zones
91406 · Van Nuys
98% in single-family zones
Zones where SB 9 lot splits and duplexes can apply. Site exclusions apply (historic districts, very high fire hazard areas, recently rented units and others). See the HCD SB 9 fact sheet.
Percentages are rounded and may not total 100%. A few multifamily RAS parcels are grouped under Other.
Source: City of Los Angeles ZIMAS zoning layer · Updated October 14, 2026
Refresh status for this source could not be confirmed.
Census profile
| Measure | 91405 | 91406 |
|---|---|---|
| Households | 19,177 | 19,029 |
| Owner-occupied share | 27% | 41% |
| Owners aged 65+ (share of owner households) | 29% | 26% |
| Median household income | $62,900 | $78,429 |
| Median home value | $737,700 | $808,900 |
| Median gross rent | $1,780 | $1,906 |
| Average household size | 2.89 | 2.72 |
| Median year housing was built | 1973 | 1965 |
| Single-family detached share of homes | 26% | 42% |
Source: U.S. Census Bureau, ACS 2020-2024 5-year · Updated ACS 2020-2024 5-year
Data may be out of date.
Data by postal code
| ZIP | New ADU permits since Jan 2024 | Median days to permit, new ADUs | Median declared construction value, new ADU | Home additions since Jan 2024 | Median days to permit, additions | Permits mentioning SB 9 or a lot split | ADU permits per 1,000 single-family lots |
|---|---|---|---|---|---|---|---|
| 91405 | 94 | 142 days | $125,500 | 165 | 79 days | 56 | 20.4 |
| 91406 | 126 | 169 days | $123,000 | 298 | 87.5 days | 86 | 15.7 |
Source: City of Los Angeles Open Data – LADBS Building Permits Issued from 2020 to Present · Updated October 10, 2026
Refresh status for this source could not be confirmed.
91406 · Van Nuys
Insights Realty analysis · Jan 2, 2020–Dec 30, 2024; permits tracked through Sep 25, 2026
386
Common questions
Since January 2024, new ADU permits in 91405 and 91406 have taken a median of 151.5 days from submission to issue (LADBS data, updated October 10, 2026). Your timeline depends on plan completeness and plan-check type.
The median single-family lot sizes by ZIP are 6,600–6,757 sq ft. California law allows detached ADUs up to 1,200 sq ft, subject to applicable standards. An SB 9 lot split needs both new lots to be at least 1,200 sq ft and at least 40% of the original lot. These figures do not determine parcel eligibility. Try the feasibility screen for your address.
HUD's FY2027 benchmark for a 1-bedroom in 91405 and 91406 is $2,420–$2,470 a month, including utilities. This is a conservative benchmark, not a market quote. Your free review includes a 15-minute call and initial parcel check, with a market rent check discussed on the call.
A lot, reimagined
Every lot is different. This illustration shows one possible way to think about added housing; it is not a property study or a promise of what a specific parcel allows.
Before
After
State guidance · local review matters
California’s ADU and JADU framework sets statewide standards, while parcel conditions and local review still affect a project. See the California HCD ADU guidance.
Some parcels may qualify for an SB 9 duplex or urban lot split, subject to statutory requirements and site-specific exclusions. Read HCD’s SB 9 fact sheet.
Home additions are reviewed under applicable local approvals and California residential building standards; requirements depend on the property and proposed work. See HCD building standards.
Los Angeles is phasing SB 79 in by transit stop; eligibility depends on your parcel.
This information is general context, not legal, zoning, or permit advice. A property-specific review is required.
Start with the property